German Volume Training — Phase 1 (Volume)
Classic German Volume Training following Charles Poliquin: one antagonist pairing per session, ten sets of ten reps each. The main lifts start at around 60% of 1RM. Once all ten sets of ten reps are completed cleanly, the load rises automatically for the next session. Three sessions per week, typically Monday, Wednesday, and Friday. Recommended block length is six weeks — followed by Phase 2 (10×6 wave) or a return to a conventional plan for consolidation.
Who is this plan for?
- Experience with hypertrophy or strength training, ready for a six-week high-volume block.
- A realistic Training Max for front squat, bench press, row, overhead press, curl, and leg curl — measured or estimated.
- Training goal: hypertrophy stimulus for the large muscle groups — chest, back, legs, arms.
- Sufficient recovery capacity: sleep, slight caloric surplus, low secondary athletic load.
How it works
- Antagonist pairing: Each session trains two opposing muscle groups alternately. Chest and back, quads and hamstrings, shoulders and biceps. The two main lifts run as supersets — set lift A, rest, set lift B, rest.
- Ten sets of ten reps: The main lifts use ten sets of ten reps. Rest between sets around 90 seconds. The same load across all ten sets — losing a rep or two toward the end is normal.
- Main-lift progression: Starting load around 60% of 1RM (or a weight that allows for about 20 reps). Once all ten sets of ten reps are completed cleanly, the weight rises for the next session. If reps break down, the load is held until the ten sets run cleanly again.
- Isolation superset: The main lifts are followed by a second superset of two isolation exercises, three sets of 10–15 reps with around 60 seconds of rest. Standard double progression: increase reps first, then weight.
- No training to failure: On the main lifts, training stops one or two reps short of failure on every set. Otherwise the ten sets cannot be completed.
Pros & Limitations
Muscles trained
Avg. hits per week · Primary 1.0 · Secondary 0.5
Program Structure
4 exercises · 26 sets
~1h 2min
Easier on the lower back: T-bar row or seated cable row.
Harder variation: pull-up.
4 exercises · 26 sets
~1h 2min
Alternative: Back Squat.
Alternative: Weighted incline crunch if no crunch machine is available.
4 exercises · 26 sets
~1h 2min
Charles R. Poliquin — German Volume Training (1996); adapted from the Sportnahrung-Engel template
Talk to your doctor before starting a new training program, especially if you have pre-existing conditions or haven't trained in a while. Start lighter than you think — good technique always comes before heavy weight.
Start this plan in hitPR
Free. All progression rules pre-configured.